MAS-DT update planning configuration message
- rename?
-
Add primitive list
-
Add primitive schema
- optionally timebound (a simulation is carried out at point in time based on the current forecast and therefore only valid for a short time)
-
oneOf defined primitive types with associated geometries
- operating area
- exclusion zone
- exclusion feature / "obstacle"? (actual location of obstacle without buffer?)
- transect
- waypoint (point feature with radius or circle at that radius or both?)
- zone (other named zone - eg scientific targets?)
- simulation (track generated by the simulator?)
- Validation of minimum requirements - there must be an operating area
-
Add primitive schema
- Add plan id and version information
-
Add capabilities to squad information
- Relies on changes to the mission_plan schema to enumerate the action schemas